Project Description

 

The creation of a new re-configured Bio-sciences laboratory at the Canterbury campus.

 

The laboratory installation comprised of both HVAC and electrical services. New piped services included boosted cold water, domestic hot water, natural gas, compressed air, vacuum, reverse osmosis plant.

 

New fume extract cupboards were installed and associated new extract ventilation plant. The perimeter heating and general ventilation was modified to suite the new layout. A new control system was installed to control the specialist ventilation plant. The electrical installation included, new power distribution systems, lighting and emergency lighting provision.

 

Modifications to existing fire detection and alarm systems.

 

All services were commissioned, balanced, tested and certificated.

 

Other Information

 

Client: University of Kent

 

Architect:

 

Project Manager: University of Kent

 

Main Contractor: Albert Soden Ltd

 

Services Consultant: Norman Bromley Partnership

 

Project Value: £250,000

 

Completion Date: August 2006